This basement remodel project was an unplanned result of a major water leak in this customer’s basement. The water damaged almost the entire basement so it was deemed to be a total rehab. We started by clearing out the space of waterlogged material, then framed out a whole new floor plan with a dedicated laundry area, sound proofed music room, and moisture tolerant flooring throughout. The customer was very happy with the end result.
Basement Remodel | Ashaway, Rhode Island
